How the Power Configurator works

We size several power plant options for your site, keep only those that can reliably meet your demand, and recommend the one that best fits your priority. Results are compared with what you would do without the project: a diesel-only plant if you are off-grid, grid supply plus diesel back-up on a weak grid, or grid supply if your connection is reliable.

1 · What it does

From your load, location, grid situation and site conditions, the configurator builds several plant options — solar, batteries, diesel or gas generators and the grid — and sizes each one for your site. Every option must provide firm capacity of at least 120% of your peak, from sources available at any hour: generators, batteries and, where it is reliable, the grid.

2 · How the recommendation is chosen

Among the options that pass this reliability check, it recommends the one that best matches the priority you pick in the last step: lowest upfront cost, lowest lifetime cost, maximum reliability or lowest emissions. "Best" therefore means best for your priority — change the priority and the recommendation can change.

3 · What it is compared against

Every saving and return is measured against what you would do without the project. This depends on your grid situation:

  • Off-grid — a diesel-only power plant sized for the same load (investment, fuel and maintenance).
  • Weak grid — grid supply plus diesel back-up to cover the outages.Your selection
  • On-grid (reliable) — buying the same energy from the grid at the national tariff. Grid connection costs are not included.
  • No comparison — if you adjust the mix yourself, or if an off-grid site can use diesel only for black-start or not at all. The plant is still sized and costed, but no savings, payback or returns are shown.
4 · How savings, NPV and IRR are calculated

Annual savings = the yearly running cost of the comparison case (fuel, grid bills, maintenance) minus the yearly running cost of the recommended plant — not fuel savings alone. The free result shows an indicative payback; the full report adds NPV and IRR: the plant's full investment is repaid by these savings over 20 years, at a 12% discount rate (default), with savings rising 3.5% a year and, if the plant has batteries, a battery replacement in year 10.

How to use the tool

Complete the 7 steps — most fields are pre-filled for your country, so you can generate a first pass with the defaults and refine it later. Hover over or tap the ⓘ next to any field to see what it means and how it affects the result. The free first pass shows the recommended mix, its costs and an indicative payback; savings, NPV and IRR are in the full report.

Quick Start Guide (PDF)

Screening-level, indicative figures to decide whether a project is worth developing further — not an engineering design or investment advice.

Sector & application

Which sector best describes the buyer?

The Power Configurator provides indicative, screening-level outputs for information only and does not constitute engineering, financial or investment advice.