Screening-level · indicative outputs

Scope your power project
in a single pass.

A professional tool for industrial, mining, utilities and telecom buyers. Enter your project parameters — sector, location, load, site conditions, grid, ownership and priorities — and receive a first-pass power scope with an optimised generation mix, budgetary costs, permitting outlook and an initial project plan.

✓ 20+ countries✓ West Africa (Nigeria, Ghana, Cote d'Ivoire, Senegal): detailed permitting✓ Editable admin coefficients
Sample first-pass output
Mix
Solar + BESS + Diesel N+1
Firm capacity
2.4 MW
Renewable frac.
62%
CAPEX range
$4.1 – 5.8m
LCOE
$0.156 / kWh
Illustrative preview. Free first pass shows the mix and cost range; full breakdown, memorandum PDF and financial plan are in the paid report.
Methodology

A defensible, transparent engine

All sizing, derating, cost and financial coefficients are visible in-app and editable per project or per region — no black-box results.

01 / 04
Load & site
Peak/energy, load pattern, altitude, ambient, irradiance — pre-filled per country, editable.
02 / 04
Grid & ownership
On-grid, weak-grid or off-grid × captive, IPP, BOO, PPP, ESCO, lease.
03 / 04
Optimise mix
Decision matrix by sector × grid × priority. Only dispatchable capacity counts toward firm.
04 / 04
Cost, permits, plan
Indicative CAPEX, OPEX, LCOE (±range), permitting by country, milestone schedule.
Buyers we serve

Built for professional buyers

The Power Configurator focuses on projects with a clear commercial off-taker or captive user — not residential kits.

Industrial
Manufacturing, warehousing, agro-processing
Mining
On-site power for open-pit and underground operations
Utilities
Independent power producers, distribution & mini-grids
Telecom
Base stations, tower networks, data centres
Report pricing

Free first pass. Detailed reports and bundles.

Bundles are prepaid credits, redeemable within 12 months, decremented one report at a time. Every report contains the same full scope.

First pass
Free
Automated rough sizing and indicative cost range. Any project. No purchase required.
  • ✓ Sector + country + load in 7 steps
  • ✓ Generation mix (solar / wind / diesel / battery)
  • ✓ Firm capacity check + renewable share
  • ✓ CAPEX range (low · expected · high)
Start free first pass
Detailed report
Most popular
$99
One-time · one full report.
  • ✓ Full power model + equipment list
  • ✓ CAPEX / OPEX breakdown + LCOE
  • ✓ Country-specific permitting map
  • ✓ Feasibility PDF + CSV export
  • ✓ Team share link
Get a detailed report
Bundle · 3 reports
$249
$83/report · save $198
  • ✓ 3 prepaid report credits
  • ✓ Redeem within 12 months
  • ✓ One-click unlock per project
  • ✓ Consolidated invoice
Buy bundle
Bundle · 5 reports
Recommended
$375
$75/report · save $370
  • ✓ 5 prepaid report credits
  • ✓ Redeem within 12 months
  • ✓ One-click unlock per project
  • ✓ Consolidated invoice
Buy bundle
Bundle · 10 reports
$650
$65/report · save $840
  • ✓ 10 prepaid report credits
  • ✓ Redeem within 12 months
  • ✓ One-click unlock per project
  • ✓ Consolidated invoice
Buy bundle
Bundle · 20 reports
$1,100
$55/report · save $1,880
  • ✓ 20 prepaid report credits
  • ✓ Redeem within 12 months
  • ✓ One-click unlock per project
  • ✓ Consolidated invoice
Buy bundle
Custom / Enterprise
$3k–$15k/yr
Set by report volume + seats · declining per-report software rate.
  • ✓ Annual software plan or prepaid credit balance
  • ✓ Volume-tiered per-report rate
  • ✓ For in-house teams running many project scopes
  • ✓ Seats for your team
Extended workflow
By arrangement
Continue the workflow beyond the automated report.
  • ✓ Extend a saved scope beyond the automated output
  • ✓ Discussed separately from software pricing
  • ✓ Report credits count towards the engagement
Power Configurator

Run more scopes, faster.

A first pass is free — pay only when you unlock the full software report. Buy in bundles to bring the per-report rate down.

Start free first pass